project info:

 

  cost: 3,500,000 to 10,000,000 USD
area: 5,000 to 12,000 ft2
architect of record: zone 4 architects
electrical, fire protection, MEP and structure: arup
civil engineering: nitsch engineering
code consultant: philip r. sherman
cost estimator: faithful + gould
geothermal engineer: haley and aldrich
facade engineering and thermal performance: simpson gumpertz and heger
landscape architect: carol r. johnson associates
materials handling: SEA consultants
specifications consultant: kalin associates
sustainable design: atelier ten

Source : designboom.com

http://www.mo-ventus.com